|
|
|
|
Significant Projects
Oil States Industries Assembly Addition - Houma, Louisiana The CASE team completed the design of the building addition which increased the overall length of the existing assembly facility by 100-ft. The building houses (2)-100-ton and (1)-50-ton overhead cranes. The design also required the addition of a 60-ft cantilever truss over a portion of the existing building to improve the existing rainfall gutter system. The contractor for the project was Roger McChargue Construction of Gray, Louisiana.
Safety & Training Consultants - New Iberia, Louisiana The CASE engineers completed this two story office and classroom facility with a 60' X 60' neighboring helicopter survival training building. CASE was the the engineer of record for the project performing complete design services and working on an expedited schedule.
First Turn, Inc. - Scott, Louisiana CASE completed the design of this 13,000 square foot showroom building for the First Turn ATV and cycle dealer in Crowley, LA. The new facility was designed from the ground up by CASE engineers who also handled all aspects from the surveying services to the facility design. The project is located adjacent to the new Harley Davidson facility off of the I-10 frontage road in Scott, LA.
Settoon Towing - Houma, Louisiana The CASE team performed the structural engineering and civil site work on this 2-acre new development. This structure consisted of a two story wood framed structure in conjunction with a metal building open area. CASE also performed the permit drawings for the city and the state fire marshal.
|
|
|